Home/Answers/Contract
SIDING COST LAB / Contract

Before Contract Processing

Before Contract, back up the original, confirm format/size/quality requirements and close programs that lock the file.

Updated 2026-11-01About 3 minLocal test
Quick answer

Before Contract, back up the original, confirm format/size/quality requirements and close programs that lock the file. Contract states scope/removal/payment/warranty.

Why it matters

Poor preparation leads to overwrites, failures and rework.

Scope.

Step by step

  1. Check material/area/height/old siding/insulation/color.
  2. Separate materials/labor/removal/insulation/trim.
  3. Get 2-3 quotes; confirm material/area/warranty.
  4. Contract states scope/removal/payment/warranty.

Common mistakes

  • Unit price only, not removal/insulation/trim.
  • Ignoring old siding/asbestos/mold.
  • Not checking permits/warranty.
  • No payment/color terms.

Checklist

  • Material/area/height/old siding/insulation.
  • Materials/labor/removal/trim.
  • Permits/asbestos/mold/color.
  • Warranty/payment/contract.
  • Budget/maintenance/ROI.

Key facts

  • Scope.
  • Removal.
  • Warranty.

FAQ

How should I prepare before Contract?

Before Contract, back up the original, confirm format/size/quality requirements and close programs that lock the file. Contract states scope/removal/payment/warranty.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Angi